The level spreaders
are being installed to help with the absorption of storm water
from the rain garden. The piping and gravel follow an exact
contour level, which causes an even distribution of the water.
(December 1, 2005)
|
Storm water
management system: the cleansing biotope is in the foreground,
the rain garden is next, followed by the Kesling Wetland. The
storm water system is designed that water will be absorbed before
reaching Kesling Wetland. (December 29, 2005)
|
 |
| |
 |
All the cut off ends
of drywall have been ground up. The truck is dumping the ground
material on site. The gypsum will be spread on the ground as
a soil amendment, which works like adding lime. (January 30,
2006)
|
| |
| |
|
| |
|
|
| |
|
|
| |
|
| |
|
|
| |
|
|